Approved · unknown
FDOT — I-4 Managed Lanes from Kirkman to SR 434 add Lanes & Reconst ruct
FL County — FDOT Contract E5W13
Load estimate pending
Lifecycle
Completed as of Oct 4, 2014
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — I-4 Managed Lanes from Kirkman to SR 434 add Lanes & Reconst ruct
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$400K
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT earthwork contract — I-4 Managed Lanes from Kirkman to SR 434 add Lanes & Reconst ruct. Vendor: I-4 MOBILITY PARTNERS OPCO LLC. Cost: $399,932. | FDOT public project (+15) | size signal: (+5) | FDOT public project (+15) | size signal: $399,932 valuation (+5) | FDOT public project (+15) | size signal: $399,932 valuation (+5)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E5W13_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
Astatula Sand Plant · Jacksonville
One-way
21.0 mi
Round trip
42.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Astatula Sand Plant | Jacksonville | 21.0 mi | 42.1 |
| sand pit | Center Sand Company | Clermont | 21.6 mi | 43.2 |
| sand pit | Independent Mine | Davenport | 21.9 mi | 43.7 |
| sand pit | Four Corners Sand Mine | Brooksville | 23.9 mi | 47.8 |
| quarry | Beeline Mine | Orlando | 26.5 mi | 53 |
| quarry | S & L Materials Inc | KISSIMMEE | 26.5 mi | 53.1 |
| sand pit | Lisbon Sand | Lexington | 26.8 mi | 53.7 |
| sand pit | Hilochee Sand Mine | Davenport | 28.2 mi | 56.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E5W13_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/21cefe23