Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — CITGO-PLANTATION #386
6318 W LINEBAUGH AVE, TAMPA, FL, 33625
~17loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — CITGO-PLANTATION #386
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.069 ac
Parcel 0238440100
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922531 from fdep_cleanup_sites
- 2026-06-11HCPACaptured HCPA_0238440100_20ab0d6f from hcpa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87942968 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_0238440100_d56f8016 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.7 mi
Round trip
19.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 9.7 mi | 19.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 19.2 mi | 38.4 |
| quarry | Caloosa Materials | Ruskin | 24.2 mi | 48.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 24.2 mi | 48.4 |
| sand pit | County Line Mine | Spring Hill | 27.1 mi | 54.3 |
| quarry | Brooksville Quarry | Brooksville | 38.1 mi | 76.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 38.5 mi | 77 |
| quarry | Four Corners | Lithia | 40.2 mi | 80.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87922531 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_0238440100_20ab0d6f | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87942968 | 2026-06-11 | Open ↗ |
| hcpa | HCPA_0238440100_d56f8016 | 2026-06-12 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 0238440100
- Strap
- U-19-28-18-ZZZ-000000-91610.0
- Address
- 6318 W LINEBAUGH AVE, TAMPA
- Zip
- 33625
- Acreage
- 0.069 ac
- Sq ft
- 3,004
- Homestead
- NO
Owner of record
SAMP INVESTMENT INC
Last sale
2020-11-09
$377,100
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/20ab0d6f