QUICK ROOFING LLC project — 34-25-20
34-25-20
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
2013 1 IH Borrower L P is undertaking a site development project at 34-25-20 with permits now issued, representing an immediate opportunity for earthwork and material hauling services. While the project description is unclassified, the permit stage indicates active mobilization is likely imminent, making this a time-sensitive prospect. Contact QUICK ROOFING LLC (owner/developer at 863-201-6025) or the prime GC directly to confirm scope requirements and secure hauling contracts before site work begins.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025097800 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 4.2 mi | 8.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.5 mi | 28.9 |
| quarry | West Florida Aggregate | Webster | 19.3 mi | 38.7 |
| sand pit | County Line Mine | Spring Hill | 20.3 mi | 40.5 |
| quarry | Brooksville South Cement Plant | Brooksville | 23.6 mi | 47.1 |
| quarry | Brooksville Quarry | Brooksville | 23.7 mi | 47.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 24.5 mi | 48.9 |
| quarry | Center Hill Mine | Brooksville | 26.5 mi | 53.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025097800 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/2013-1-ih-borrower-l-p-project-34-25-20-pasco-fl-2046a3d2