Leads/1ef61551
Approved · unknownPINELLAS County

Cleanup (petroleum cleanup) — 1ST AVE EXXON (FKA SUNCOAST #20)

3061 1ST AVE N, SAINT PETERSBURG, FL, 33713

~35loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 8, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — 1ST AVE EXXON (FKA SUNCOAST #20)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.1394 ac
Parcel 286652
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
BLACKWOOD, KAVIN
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-09FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87912848 from fdep_cleanup_sites
  2. 2026-06-29FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88117004 from fdep_cleanup_sites
  3. 2026-07-05PCPAO
    Captured PCPAO_286652_1ef61551 from pcpao
  4. 2026-07-06PCPAO
    Captured PCPAO_286652_3cab4fbe from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
15.2 mi
Round trip
30.4 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin15.2 mi30.4
quarryTampa Cement Grinding PlantTampa18.2 mi36.4
quarryCentral State Aggregates LLCZephyrhill37.8 mi75.5
quarryWingate Creek MineLithia38.7 mi77.4
quarryFour CornersLithia43.1 mi86.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 43.9 mi87.8
quarrySouth Pasture MineLithia45.4 mi90.8
sand pitCounty Line MineSpring Hill46.0 mi92.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
BLACKWOOD, KAVIN

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_879128482026-06-09Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_881170042026-06-29Open ↗
pcpaoPCPAO_286652_1ef615512026-07-05Open ↗
pcpaoPCPAO_286652_3cab4fbe2026-07-06Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
286652
Strap
26-31-16-00432-003-0170
Address
3061 21st Ave S
Zip
33712
Acreage
0.1394 ac
Sq ft
6,072
Year built
2001
Use
0110 Single Family ...
Subdivision
ALLEN-GAY SUB
Owner of record
BLACKWOOD, KAVIN
Last sale
2015-03-01
$66,000
Appraiser valuation
Just (market)
$260,823
Assessed
$75,888
Taxable
$25,166

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1ef61551