Leads/1d78a7ff
Approved · application_filedHernando County

Ellianos Coffee - Spring Hill

SWFWMD ERP — site address pending

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

Ellianos Coffee - Spring Hill

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Wind River Coffee, LLC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-17SWFWMD_ERP
    Captured SWFWMD_ERP_940674 from swfwmd_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
3.9 mi
Round trip
7.7 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill3.9 mi7.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 9.6 mi19.3
quarryBrooksville QuarryBrooksville14.4 mi28.8
quarryBrooksville South Cement PlantBrooksville15.4 mi30.7
quarryCalcium PlantJacksonville17.5 mi35.1
quarryCenter Hill MineBrooksville22.0 mi44.1
quarryLecanto MineCrystal River26.3 mi52.7
quarryCentral State Aggregates LLCZephyrhill26.6 mi53.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Wind River Coffee, LLC
426 SW COMMERCE DR SUITE 135 LAKE CITY, FL 32025

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

Official source-of-truth portal
Hernando County Permits
Spring Hill / Brooksville Building
ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9406742026-05-17Open ↗

Parcel Detail

Property records and ownership

Property
County
Hernando
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1d78a7ff