Leads/189ae671
Approved · unknownManatee County

FDOT — SR 789 FROM S OF COQUINA PARK ENT TO SR 64 - PAVEMENT ONLY R ESURFACE (FLEX)

Manatee County — FDOT Contract E1X77

Load estimate pending
Lifecycle
Completed as of Nov 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 789 FROM S OF COQUINA PARK ENT TO SR 64 - PAVEMENT ONLY R ESURFACE (FLEX)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$3.1M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 789 FROM S OF COQUINA PARK ENT TO SR 64 - PAVEMENT ONLY R ESURFACE (FLEX). Vendor: AJAX PAVING INDUSTRIES OF FLORIDA LLC. Cost: $3,063,129. | FDOT public project (+15) | size signal: $3,063,129 valuation (+12) | FDOT public project (+15) | size signal: $3,063,129 valuation (+12) | FDOT public project (+15) | size signal: $3,063,129 valuation (+12) | FDOT public project (+15) | size signal: $3,063,129 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E1X77_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.9 mi
Round trip
19.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
22.8 mi
Round trip
45.5 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin22.8 mi45.5
quarryWingate Creek MineLithia35.3 mi70.7
quarryTampa Cement Grinding PlantTampa36.0 mi72
quarryFlorida Shell & Fill Company LLCNaples42.0 mi84
quarrySouth Pasture MineLithia47.6 mi95.3
quarryFour CornersLithia49.1 mi98.1
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.9 mi19.8
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota12.1 mi24.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E1X77_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/189ae671