Approved · unknownFLAGLER County
Cleanup (petroleum cleanup) — SHELL-M&B
908 STATE ST, BUNNELL, FL, 32010
Load estimate pending
Lifecycle
Permitted as of Jul 6, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — SHELL-M&B
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-06FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88194932 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY · Bunnell
One-way
3.9 mi
Round trip
7.8 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
22.7 mi
Round trip
45.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SRM Materials East Palatka | Murfresboro | 22.7 mi | 45.4 |
| sand pit | Keuka Sand Plant | Jacksonville | 41.3 mi | 82.6 |
| quarry | Edgar Minerals, Inc. | Davenport | 42.4 mi | 84.7 |
| sand pit | Lynne Mine | Davenport | 42.9 mi | 85.8 |
| sand pit | Grandin Sand Plant | Jacksonville | 44.3 mi | 88.6 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 49.4 mi | 98.8 |
| landfill | FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY | Bunnell | 3.9 mi | 7.8 |
| transfer station | ORMOND BEACH TRANSFER STATION | Ormond Beach | 15.8 mi | 31.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88194932 | 2026-07-06 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- FLAGLER
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/17beb5bc