Leads/166f38d4
Approved · unknownWashington County

FDOT — SR 79 FROM SOUTH OF MILLERS FERRY RD TO MALLORY RD - FLEXIBL E PAVEMENT RECONSTRUCT.

Washington County — FDOT Contract T3910

Load estimate pending
Lifecycle
Active as of Feb 11, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SR 79 FROM SOUTH OF MILLERS FERRY RD TO MALLORY RD - FLEXIBL E PAVEMENT RECONSTRUCT.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$17.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 79 FROM SOUTH OF MILLERS FERRY RD TO MALLORY RD - FLEXIBL E PAVEMENT RECONSTR. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $17,420,032. | FDOT public project (+15) | size signal: $17,420,032 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $17,420,032 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $17,420,032 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $17,420,032 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T3910_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
11.6 mi
Round trip
23.1 mi
TypeNameCityOne-wayRT mi
sand pitSandhills Plant 2Dothan11.6 mi23.1
sand pitPanama City QuarryMurfresboro13.2 mi26.5
sand pitMVM Landfill, LLCDeFuniak Springs20.7 mi41.3
sand pitMossy Head WestDothan31.9 mi63.9
sand pitMOSSEYHEAD MINESCENTURY31.9 mi63.9
quarryJones PitChiefland34.1 mi68.3
sand pitUSA CalciumMarianna35.7 mi71.5
quarryImperial Rock MineMarianna35.9 mi71.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Washington County Permits
Chipley Building Department
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T3910_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Washington
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/166f38d4