Leads/1600267d
Approved · unknownPalm Beach County

FDOT — SR-A1A FROM SOUTH OF GRAND CT TO SOUTH OF LINTON BLVD - RESU RFACING

Palm Beach County — FDOT Contract T4657

Load estimate pending
Lifecycle
Completed as of May 29, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR-A1A FROM SOUTH OF GRAND CT TO SOUTH OF LINTON BLVD - RESU RFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$8.3M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR-A1A FROM SOUTH OF GRAND CT TO SOUTH OF LINTON BLVD - RESU RFACING. Vendor: THE STOUT GROUP LLC. Cost: $8,287,882. | FDOT public project (+15) | size signal: $8,287,882 valuation (+20) | FDOT public project (+15) | size signal: $8,287,882 valuation (+20) | FDOT public project (+15) | size signal: $8,287,882 valuation (+20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T4657_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Palm Beach Aggregates LLC · Jacksonville
One-way
28.0 mi
Round trip
56 mi
TypeNameCityOne-wayRT mi
quarryPalm Beach Aggregates LLCJacksonville28.0 mi56
quarryWHITE ROCK QUARRIESWest Palm Beach38.6 mi77.2
quarryFEC QUARRYMIAMI41.1 mi82.3
quarryPENNSUCO QUARRYMedley41.4 mi82.8
quarryPENNSUCO CEMENT PLANTMedley41.4 mi82.8
quarryStar QuarriesSOUTH BAY45.4 mi90.7
quarryMiami QuarryJacksonville46.8 mi93.7
quarryEpic Stoneworks, Inc.Cutler Bay47.2 mi94.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Palm Beach County Permits
West Palm Beach Planning, Zoning & Building
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T4657_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Palm Beach
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1600267d