Leads/147185cb
Approved · unknownHILLSBOROUGH County

State 404 — 7021 BIG BEND ROAD, GIBSONTON

7021 BIG BEND ROAD, GIBSONTON, FL, 33534

Load estimate pending
Lifecycle
Permitted as of Sep 2, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — 7021 BIG BEND ROAD, GIBSONTON

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0400716-001-NPR from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
7.4 mi
Round trip
14.8 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin7.4 mi14.8~40m$110–$140
quarryTampa Cement Grinding PlantTampa11.0 mi21.9~55m$140–$175
quarryFour CornersLithia24.5 mi48.9~75m$175–$230
quarryWingate Creek MineLithia25.2 mi50.3~100m$230–$290
quarrySouth Pasture MineLithia27.7 mi55.4~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill28.9 mi57.8~100m$230–$290
quarrySouth Fort Meade MineLithia38.8 mi77.7~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 41.8 mi83.5~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0400716-001-NPR2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
HILLSBOROUGH
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/147185cb