Approved · unknownHighlands County
FDOT — SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD - RESUR FACING
Highlands County — FDOT Contract T1894
Load estimate pending
Lifecycle
Active as of Nov 20, 2024
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD - RESUR FACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$4.8M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 25 (US 27) FROM SHORELINE DR TO DAVIS & GAINES RD - RESUR FACING. Vendor: C.W. ROBERTS CONTRACTING, INC.. Cost: $4,839,385. | FDOT public project (+15) | size signal: $4,839,385 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $4,839,385 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $4,839,385 valuation (+12) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $4,839,385 valuation (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T1894_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Farabee Mine & Shell LLC · Punta Gorda
One-way
29.9 mi
Round trip
59.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Farabee Mine & Shell LLC | Punta Gorda | 29.9 mi | 59.8 |
| quarry | Neal Aggregates | Punta Gorda | 31.7 mi | 63.4 |
| quarry | 4M-31 Mine | Alva | 31.8 mi | 63.6 |
| sand pit | Watermelon Pit | Punta Gorda | 32.3 mi | 64.7 |
| sand pit | Willliams Farms Sand & Shell, Inc. | PUNTA GORDA | 33.1 mi | 66.1 |
| sand pit | Bermont Excavating Site 2 | Punta Gorda | 33.4 mi | 66.7 |
| quarry | Wright Farms Pit | Nocatee | 33.5 mi | 66.9 |
| quarry | South Fort Meade Mine | Lithia | 33.5 mi | 66.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T1894_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Highlands
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/1407969a