Leads/13ffcd4b
Approved · unknownManatee County

Beach nourishment — Anna Maria Island (332,112 cy)

Anna Maria Island, Manatee County, FL

Load estimate pending
Lifecycle
Completed as of Apr 1, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Beach nourishment — Anna Maria Island (332,112 cy)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$4.0M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Beach nourishment Manatee County Shore Protection Project — 332,112 cy placed. Source: Passage Key ebb shoal. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years. | size signal: $3,985,344 valuation (+12) | size signal: $3,985,344 valuation (+12) | size signal: $3,985,344 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SAND_PLACEMENT
    Captured FDEP_SANDPLACE_152 from fdep_sand_placement

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.9 mi
Round trip
19.9 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
22.8 mi
Round trip
45.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin22.8 mi45.6
quarryWingate Creek MineLithia35.4 mi70.7
quarryTampa Cement Grinding PlantTampa36.1 mi72.1
quarryFlorida Shell & Fill Company LLCNaples42.0 mi84
quarrySouth Pasture MineLithia47.7 mi95.4
quarryFour CornersLithia49.1 mi98.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.9 mi19.9
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota12.1 mi24.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_sand_placementFDEP_SANDPLACE_1522026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/13ffcd4b