Leads/1385-67th-ave-s-pinellas-fl-b2a8b04a
Approved · unknownPinellas County

1385 67TH AVE S

1385 67TH AVE S

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

1385 67TH AVE S

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.1763 ac
Parcel 322847
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
A PURPOSE CONSTRUCTION LLC
📞 (504) 317-2037
Developer / Applicant
ROWE, RENEE E
Why this is a hauling opportunity: Building permit | Connector base: 50

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-04-19STPETE_CLICK2GOV
    Captured 21-04001272 from stpete_click2gov
  2. 2026-05-17PCPAO
    Captured PCPAO_323499_90ec8259 from pcpao
  3. 2026-05-19PCPAO
    Captured PCPAO_322632_90ec8259 from pcpao
  4. 2026-05-22PCPAO
    Captured PCPAO_322578_90ec8259 from pcpao
  5. 2026-05-25PCPAO
    Captured PCPAO_322934_90ec8259 from pcpao
  6. 2026-05-27PCPAO
    Captured PCPAO_322847_90ec8259 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
HOWCO ENV. SERVICES (UOP) · St Petersburg
One-way
4.5 mi
Round trip
8.9 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
13.0 mi
Round trip
26 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin13.0 mi26
quarryTampa Cement Grinding PlantTampa20.3 mi40.5
quarryWingate Creek MineLithia35.5 mi70.9
quarryCentral State Aggregates LLCZephyrhill40.6 mi81.1
quarryFour CornersLithia41.8 mi83.7
quarrySouth Pasture MineLithia43.3 mi86.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 47.8 mi95.7
transfer stationHOWCO ENV. SERVICES (UOP)St Petersburg4.5 mi8.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ROWE, RENEE E
Contractor
A PURPOSE CONSTRUCTION LLC
2 active projects · Pinellas
📞 (504) 317-2037

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
stpete_click2gov21-040012722026-04-19Open ↗
pcpaoPCPAO_323499_90ec82592026-05-17Open ↗
pcpaoPCPAO_322632_90ec82592026-05-19Open ↗
pcpaoPCPAO_322578_90ec82592026-05-22Open ↗
pcpaoPCPAO_322934_90ec82592026-05-25Open ↗
pcpaoPCPAO_322847_90ec82592026-05-27Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
323499
Strap
12-32-16-72432-001-0100
Address
1385 67th Ave S
Zip
33705
Acreage
0.1763 ac
Sq ft
7,680
Year built
1974
Use
0110 Single Family ...
Subdivision
<span title="POINT PINELLAS HEIGHTS">Point Pinellas Heig ...</span>
Owner of record
ROWE, RENEE E
ROWE, RICKY E
Last sale
1998-09-01
$110,000
Appraiser valuation
Just (market)
$345,251
Assessed
$142,436
Taxable
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/1385-67th-ave-s-pinellas-fl-b2a8b04a