Leads/12796031
Approved · unknownPASCO County

USACE 404 — 5749 COLONIAL DR [BOAT LIFT]

5749 COLONIAL DR, NEW PORT RICHEY, FL, 34653

~58loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jan 22, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 5749 COLONIAL DR [BOAT LIFT]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/22/2021 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.23 ac
Parcel 09-26-16-0070-00000-0430
Est truck loads
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
OSORIO JOSE & DEBRA
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~58 est. loads (+6) | stage=permit_issued, but stale (5y old) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0397654-001-EE from fdep_spgp
  2. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0412013-001-EE from fdep_spgp
  3. 2026-06-03PASCOPA
    Captured PASCOPA_09-26-16-0070-00000-0430_12796031 from pascopa
  4. 2026-06-03PASCOPA
    Captured PASCOPA_09-26-16-0070-00000-0430_50484cc6 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.8 mi
Round trip
31.7 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.8 mi31.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 16.8 mi33.7
quarryCentral State Aggregates LLCZephyrhill25.4 mi50.7
quarryTampa Cement Grinding PlantTampa26.6 mi53.2
quarryBrooksville QuarryBrooksville28.8 mi57.6
quarryBrooksville South Cement PlantBrooksville29.6 mi59.1
quarryCalcium PlantJacksonville32.3 mi64.6
quarryCenter Hill MineBrooksville36.1 mi72.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
OSORIO JOSE & DEBRA

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0397654-001-EE2026-05-28Open ↗
fdep_spgpFDEP_SPGP_0412013-001-EE2026-05-28Open ↗
pascopaPASCOPA_09-26-16-0070-00000-0430_127960312026-06-03Open ↗
pascopaPASCOPA_09-26-16-0070-00000-0430_50484cc62026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
09-26-16-0070-00000-0430
Strap
09-26-16-0070-00000-0430
Address
5749 COLONIAL DRIVE, NEW PORT RICHEY
Zip
34653
Acreage
0.23 ac
Sq ft
10,019
Use
Improved
Owner of record
OSORIO JOSE & DEBRA
Last sale
2019-09-16
$250,000
Appraiser valuation
Just (market)
$439,615

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/12796031