Approved · unknownLee County
Beach nourishment — Captiva Island (1,595,000 cy)
Captiva Island, Lee County, FL
Load estimate pending
Lifecycle
Completed as of Apr 1, 1989
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Beach nourishment — Captiva Island (1,595,000 cy)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$19.1M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Beach nourishment Lee County Shore Protection Project — 1,595,000 cy placed. Source: Redfish Pass ebb shoal. Type: Nourishment. Counties with prior nourishment cycle every 6-10 years. | size signal: $19,140,000 valuation (+20) | size signal: $19,140,000 valuation (+20) | size signal: $19,140,000 valuation (+20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_SAND_PLACEMENTCaptured FDEP_SANDPLACE_234 from fdep_sand_placement
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
28.1 mi
Round trip
56.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | ALICO ROAD QUARRY | Miami | 28.1 mi | 56.1 |
| quarry | Florida Shell & Fill Company LLC | Naples | 28.6 mi | 57.1 |
| quarry | Fort Myers Mine | Jacksonville | 30.2 mi | 60.3 |
| quarry | Fort Myers Quarry | Fort Myers | 30.8 mi | 61.6 |
| quarry | Jayrock | Punta Gorda | 31.4 mi | 62.8 |
| quarry | Bermont Materials Alico | Punta Gorda | 31.9 mi | 63.7 |
| quarry | SRM Materials Punta Gorda | Murfreesboro | 32.1 mi | 64.3 |
| sand pit | Washington Loop Mine | Punta Gorda | 32.6 mi | 65.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_sand_placement | FDEP_SANDPLACE_234 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Lee
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/111ea051