Approved · unknownOSCEOLA County
Cleanup (petroleum cleanup) — CIRCLE K #2709750
2704 MICHIGAN AVE, KISSIMMEE, FL, 34744
Load estimate pending
Lifecycle
Permitted as of Jul 3, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — CIRCLE K #2709750
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88165424 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
FLINT PLANT · Davenport
One-way
14.8 mi
Round trip
29.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | FLINT PLANT | Davenport | 14.8 mi | 29.6 |
| sand pit | Davenport Sand Mine | Brooksville | 15.3 mi | 30.5 |
| sand pit | SILICA PLANT | Davenport | 15.5 mi | 31 |
| sand pit | Cypress Sand | Lexington | 17.0 mi | 33.9 |
| sand pit | Gator Sand Mine | Brooksville | 18.2 mi | 36.4 |
| sand pit | Hilochee Sand Mine | Davenport | 19.0 mi | 38 |
| sand pit | Green Bay Mine | Davenport | 19.7 mi | 39.4 |
| sand pit | Four Corners Sand Mine | Brooksville | 19.9 mi | 39.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88165424 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- OSCEOLA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/10bb6d25