Leads/0f4b80e2
Approved · planning

CITY OF NEW PORT RICHEY

4730 MAIN STREET, NEW PORT RICHEY, FL, 34652

Load estimate pending
Lifecycle
Permitted as of Aug 7, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CITY OF NEW PORT RICHEY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
THE CITY OF NEW PORT RICHEY
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (11y old) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0327915-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
16.4 mi
Round trip
32.8 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill16.4 mi32.8~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.9 mi35.7~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill27.0 mi53.9~100m$230–$290
quarryTampa Cement Grinding PlantTampa27.9 mi55.8~100m$230–$290
quarryBrooksville QuarryBrooksville29.4 mi58.7~100m$230–$290
quarryBrooksville South Cement PlantBrooksville30.2 mi60.3~100m$230–$290
quarryCalcium PlantJacksonville32.8 mi65.6~100m$230–$290
quarryCenter Hill MineBrooksville36.7 mi73.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
THE CITY OF NEW PORT RICHEY

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0327915-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/0f4b80e2