Approved · unknown
Asphalt Plant — SLOAN CONSTRUCTION
1/8 M N/O HARMONY, DE LAND, FL
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Asphalt Plant — SLOAN CONSTRUCTION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Asphalt Plant INACTIVE (shutdown unknown).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_1270013 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
ORMOND BEACH TRANSFER STATION · Ormond Beach
One-way
2.9 mi
Round trip
5.8 mi
Closest import source (quarry)
SRM Materials East Palatka · Murfresboro
One-way
35.6 mi
Round trip
71.1 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | SRM Materials East Palatka | Murfresboro | 35.6 mi | 71.1 |
| sand pit | Lynne Mine | Davenport | 48.0 mi | 96.1 |
| transfer station | ORMOND BEACH TRANSFER STATION | Ormond Beach | 2.9 mi | 5.8 |
| landfill | TOMOKA FARMS ROAD LANDFILL | Port Orange | 12.7 mi | 25.4 |
| landfill | FLAGLER CDS, INCORPORATED C&D DEBRIS FACILITY | Bunnell | 16.8 mi | 33.7 |
| transfer station | WEST VOLUSIA TRANSFER STATION | Deland | 21.3 mi | 42.7 |
| landfill | SAMSULA LANDFILL | New Smyrna Beach | 22.5 mi | 45.1 |
| landfill | 4 JAYS LANDFILL, LLC | New Smyrna Beach | 22.8 mi | 45.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_1270013 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/0e5c93e3