Leads/0c16ea7f
Approved · unknownHillsborough County

FDOT — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RECONSTRUCT

Hillsborough County — FDOT Contract T7501

Load estimate pending
Lifecycle
Active as of Dec 9, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RECONSTRUCT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$46.5M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT earthwork contract — I-75/SR 93A SB FROM S OF TAMPA BYPASS CANAL TO S OF FOWLER A VE - ADD LANES & RE. Vendor: WEBBER, LLC. Cost: $46,465,875. | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $46,465,875 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T7501_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.0 mi
Round trip
18.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa9.0 mi18.1
quarryCentral State Aggregates LLCZephyrhill12.0 mi23.9
quarryCaloosa MaterialsRuskin23.8 mi47.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 25.6 mi51.1
quarryFour CornersLithia29.9 mi59.7
sand pitCounty Line MineSpring Hill30.4 mi60.8
quarryWest Florida AggregateWebster34.9 mi69.9
quarrySouth Pasture MineLithia36.5 mi73
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T7501_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/0c16ea7f