Coastal Env — coastal_env (Town of Surfside)
Surfside Beach (R31.5 - R-36)
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 6/16/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_COASTAL_ENVCaptured FDEP_COASTAL_ENV_0445317-001-JC from fdep_coastal_env
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Epic Stoneworks, Inc. | Cutler Bay | 14.5 mi | 29.1 |
| quarry | FEC QUARRY | MIAMI | 15.1 mi | 30.1 |
| quarry | PENNSUCO CEMENT PLANT | Medley | 15.5 mi | 31 |
| quarry | PENNSUCO QUARRY | Medley | 15.5 mi | 31 |
| quarry | Miami Quarry | Jacksonville | 17.5 mi | 35 |
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 17.8 mi | 35.6 |
| quarry | Miami Cement Plant | Miami | 19.8 mi | 39.6 |
| quarry | Krome Quarry | MIAMI | 26.2 mi | 52.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_coastal_env | FDEP_COASTAL_ENV_0445317-001-JC | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/0a364bf7