Leads/06ca48e1
Approved · unknownPolk County

FDOT — SR 37 FROM N OF SR 674 TO S OF CR 630 - PAVEMENT ONLY RESURF ACE (FLEX)

Polk County — FDOT Contract E1W87

Load estimate pending
Lifecycle
Completed as of Oct 13, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 37 FROM N OF SR 674 TO S OF CR 630 - PAVEMENT ONLY RESURF ACE (FLEX)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$1.9M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 37 FROM N OF SR 674 TO S OF CR 630 - PAVEMENT ONLY RESURF ACE (FLEX). Vendor: HUBBARD CONSTRUCTION COMPANY. Cost: $1,940,479. | FDOT public project (+15) | size signal: $1,940,479 valuation (+12) | FDOT public project (+15) | size signal: $1,940,479 valuation (+12) | FDOT public project (+15) | size signal: $1,940,479 valuation (+12) | FDOT public project (+15) | size signal: $1,940,479 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E1W87_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Four Corners · Lithia
One-way
2.8 mi
Round trip
5.5 mi
TypeNameCityOne-wayRT mi
quarryFour CornersLithia2.8 mi5.5
quarrySouth Pasture MineLithia6.8 mi13.7
quarrySouth Fort Meade MineLithia16.1 mi32.2
quarryWingate Creek MineLithia17.9 mi35.7
quarryCaloosa MaterialsRuskin27.0 mi53.9
quarryTampa Cement Grinding PlantTampa30.4 mi60.8
sand pitDiamond Sand PlantJacksonville32.1 mi64.2
sand pitLake Wales Dry PlantDavenport32.5 mi64.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E1W87_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/06ca48e1