Approved · planning

TAMPA PORT AUTHORITY

4229 MARITIME BLVD., TAMPA, FL, 33605

Load estimate pending
Lifecycle
Permitted as of Apr 20, 2007
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TAMPA PORT AUTHORITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
HPA, INC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (19y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0266058-001-SI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.9 mi
Round trip
3.7 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa1.9 mi3.7~25m$85–$110
quarryCaloosa MaterialsRuskin14.2 mi28.5~55m$140–$175
quarryCentral State Aggregates LLCZephyrhill22.1 mi44.2~75m$175–$230
quarryFour CornersLithia30.2 mi60.4~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 33.1 mi66.2~100m$230–$290
quarryWingate Creek MineLithia34.2 mi68.5~100m$230–$290
quarrySouth Pasture MineLithia35.0 mi70.1~100m$230–$290
sand pitCounty Line MineSpring Hill37.0 mi74~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
HPA, INC
3521 S W 42 AVE GAINESVILLE FLA 32601
People (4)
  • FL FOREST . GAINESVILLE · VD HOPE,N
  • NORWOOD W . GAINESVILLE, FL HOPE · P
  • BESSIE O. . GAINESVILLE, FL HOPE · D
  • WILBUR . GAINESVILLE, FL HARLING · SD

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0266058-001-SI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/066b6b0a