Leads/05288f59
Approved · unknown

CCCL — Dune Walkover (Coastal CCCL owner)

7988 East Hwy 30A Santa Rosa Beach

Load estimate pending
Lifecycle
Permitted as of Dec 22, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Dune Walkover (Coastal CCCL owner)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/22/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8041822 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
WEST BAY C&D DISPOSAL FACILITY · Panama City Beach
One-way
9.1 mi
Round trip
18.3 mi
Closest import source (sand pit)
Sandhills Plant 2 · Dothan
One-way
25.5 mi
Round trip
51 mi
TypeNameCityOne-wayRT mi
sand pitSandhills Plant 2Dothan25.5 mi51
sand pitMVM Landfill, LLCDeFuniak Springs26.5 mi53
sand pitMOSSEYHEAD MINESCENTURY34.7 mi69.4
sand pitMossy Head WestDothan34.7 mi69.4
sand pitPanama City QuarryMurfresboro35.7 mi71.4
sand pitG2C Sand MineNiceville39.3 mi78.6
sand pitRiver Road PitNavarre48.9 mi97.8
landfillWEST BAY C&D DISPOSAL FACILITYPanama City Beach9.1 mi18.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80418222026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/05288f59