Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — BP OIL CO
5581 COMMERCE ST, TAMPA, FL, 33605
~482loads
fill dirt + base rock
3 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — BP OIL CO
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
1.927 ac
Parcel 1393280000
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: 1.9 ac disturbed, ~482 est. loads (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87799633 from fdep_cleanup_sites
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922306 from fdep_cleanup_sites
- 2026-06-12HCPACaptured HCPA_1393280000_0502a351 from hcpa
- 2026-06-12HCPACaptured HCPA_1393280000_fb18a21d from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
7.9 mi
Round trip
15.7 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 7.9 mi | 15.7 |
| quarry | Caloosa Materials | Ruskin | 12.5 mi | 25.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 28.0 mi | 55.9 |
| quarry | Four Corners | Lithia | 35.4 mi | 70.8 |
| quarry | Wingate Creek Mine | Lithia | 35.7 mi | 71.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 36.4 mi | 72.7 |
| quarry | South Pasture Mine | Lithia | 39.2 mi | 78.3 |
| sand pit | County Line Mine | Spring Hill | 39.5 mi | 78.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87799633 | 2026-05-28 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922306 | 2026-06-10 | Open ↗ |
| hcpa | HCPA_1393280000_0502a351 | 2026-06-12 | Open ↗ |
| hcpa | HCPA_1393280000_fb18a21d | 2026-06-12 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1393280000
- Strap
- A-19-30-18-ZZZ-000005-56160.0
- Address
- 5581 COMMERCE ST, TAMPA
- Zip
- 33616
- Acreage
- 1.927 ac
- Sq ft
- 83,952
- Homestead
- NO
Owner of record
CYBER FUELS GATEWAY TERMINAL LLC
Last sale
2025-01-10
$100(transfer)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/0502a351