Leads/03988ac0
Approved · unknownMANATEE County

State 404 — MAGNOLIA RESERVE

2703 36TH AVE E, PALMETTO, FL, 34221

Load estimate pending
Lifecycle
Permitted as of Aug 29, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

State 404 — MAGNOLIA RESERVE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_STATE404
    Captured FDEP_ST404_0427718-001-NPR from fdep_state404

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
12.6 mi
Round trip
25.3 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin12.6 mi25.3~55m$140–$175
quarryWingate Creek MineLithia25.1 mi50.1~100m$230–$290
quarryTampa Cement Grinding PlantTampa28.0 mi55.9~100m$230–$290
quarrySouth Pasture MineLithia36.4 mi72.8~100m$230–$290
quarryFour CornersLithia37.6 mi75.2~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples42.5 mi85.1~130m$290–$370
quarry4M-31 MineAlva46.9 mi93.8~130m$290–$370
quarrySouth Fort Meade MineLithia48.1 mi96.1~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
fdep_state404FDEP_ST404_0427718-001-NPR2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
MANATEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/03988ac0