Approved · unknownFranklin County
FDOT — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING
Franklin County — FDOT Contract T3905
Load estimate pending
Lifecycle
Completed as of May 5, 2025
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
FDOT — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$3.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING. Vendor: ROBERTS AND ROBERTS, INC.. Cost: $3,397,566. | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_T3905_3 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
5.8 mi
Round trip
11.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| transfer station | FRANKLIN COUNTY CENTRAL LANDFILL | Eastpoint | 5.8 mi | 11.6 |
| landfill | FIVE POINTS CLASS III LANDFILL | Port St Joe | 22.2 mi | 44.3 |
| transfer station | INDUSTRIAL ROAD TRANSFER STATION | Port St Joe | 23.4 mi | 46.8 |
| landfill | BLOUNTSTOWN C&D DISPOSAL FACILITY | Blountstown | 49.2 mi | 98.4 |
| landfill | (unnamed) | — | 5.9 mi | 11.9 |
| landfill | (unnamed) | — | 6.3 mi | 12.5 |
| landfill | (unnamed) | — | 7.0 mi | 14 |
| landfill | (unnamed) | — | 22.2 mi | 44.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_T3905_3 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Franklin
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/02a43af8