Leads/02a43af8
Approved · unknownFranklin County

FDOT — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING

Franklin County — FDOT Contract T3905

Load estimate pending
Lifecycle
Completed as of May 5, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$3.4M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST - RESURFACING. Vendor: ROBERTS AND ROBERTS, INC.. Cost: $3,397,566. | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12) | FDOT public project (+15) | size signal: $3,397,566 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_T3905_3 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
5.8 mi
Round trip
11.6 mi
TypeNameCityOne-wayRT mi
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint5.8 mi11.6
landfillFIVE POINTS CLASS III LANDFILLPort St Joe22.2 mi44.3
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe23.4 mi46.8
landfillBLOUNTSTOWN C&D DISPOSAL FACILITYBlountstown49.2 mi98.4
landfill(unnamed)5.9 mi11.9
landfill(unnamed)6.3 mi12.5
landfill(unnamed)7.0 mi14
landfill(unnamed)22.2 mi44.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Franklin County Permits
Carrabelle / Apalachicola Building
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_T3905_32026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Franklin
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/02a43af8