Leads/01d0e516
Approved · unknownPINELLAS County

USACE 404 — 300 PAMPAS AVE., TARPON SPRINGS

300 PAMPAS AVE, TARPON SPRINGS, FL, 34689

Load estimate pending
Lifecycle
Permitted as of Apr 22, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 300 PAMPAS AVE., TARPON SPRINGS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/22/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0305449-005-EI from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
22.7 mi
Round trip
45.4 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill22.7 mi45.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.3 mi46.5
quarryTampa Cement Grinding PlantTampa24.6 mi49.2
quarryCentral State Aggregates LLCZephyrhill28.8 mi57.5
quarryBrooksville QuarryBrooksville35.6 mi71.3
quarryBrooksville South Cement PlantBrooksville36.4 mi72.8
quarryCaloosa MaterialsRuskin36.7 mi73.5
quarryCalcium PlantJacksonville39.2 mi78.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0305449-005-EI2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/01d0e516