Leads/00e24dcb
Approved · planning

STANLEY, GERALD - LOT 14

3701 LITTLE ROAD, LUTZ, FL, 32549

Load estimate pending
Lifecycle
Permitted as of Feb 15, 2013
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

STANLEY, GERALD - LOT 14

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
GERALD STANLEY
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (13y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0244700-002-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
MVM Landfill, LLC · DeFuniak Springs
One-way
22.7 mi
Round trip
45.4 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitMVM Landfill, LLCDeFuniak Springs22.7 mi45.4~75m$175–$230
sand pitMossy Head WestDothan27.0 mi54~100m$230–$290
sand pitMOSSEYHEAD MINESCENTURY27.0 mi54~100m$230–$290
sand pitG2C Sand MineNiceville28.4 mi56.8~100m$230–$290
sand pitSandhills Plant 2Dothan35.4 mi70.8~100m$230–$290
sand pitRiver Road PitNavarre36.5 mi73~100m$230–$290
sand pitPanama City QuarryMurfresboro43.6 mi87.2~130m$290–$370
sand pitQuikrete MineMILTON48.7 mi97.4~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
GERALD STANLEY

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0244700-002-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/00e24dcb