Leads/wilson-marissa-project-22-26-20-pasco-fl-4c8d0d01
Approved · unknownPasco County

UB CONSULTING LLC project — 22-26-20

22-26-20

~7.6kloads
fill dirt + base rock
~12 mo
Lifecycle
Permitted as of Apr 6, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

UB CONSULTING LLC project — 22-26-20

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
54.77 ac
Parcel 22-26-20-0040-B1A00-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
UB CONSULTING LLC
📞 (786) 452-2837
Developer / Applicant
WILSON MARISSA
Why this is a hauling opportunity: NOC — unclassified description: 22-26-20 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 55 ac disturbed, ~7607 est. loads (+30) | stage=permit_issued, recent (+10) | size signal: 55 ac disturbed, ~7607 est. loads (+30) | stage=permit_issued, recent (+10) | size signal: 55 ac disturbed, ~7607 est. loads (+30) | stage=permit_issued, recent (+10) | size signal: 55 ac disturbed, ~7607 est. loads (+30) | stage=permit_issued, recent (+10) | size signal: 55 ac disturbed, ~7607 est. loads (+30) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026061845 from pasco_noc
  2. 2026-06-27FL_DOR_CADASTRAL
    Captured FDOR_22-26-20-0040-B1A00-0000_066309a4 from fl_dor_cadastral
  3. 2026-06-29PASCOPA
    Captured PASCOPA_22-26-20-0040-B1A00-0000_066309a4 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
0.2 mi
Round trip
0.4 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill0.2 mi0.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.1 mi34.2
quarryTampa Cement Grinding PlantTampa20.8 mi41.5
sand pitCounty Line MineSpring Hill22.8 mi45.6
quarryWest Florida AggregateWebster22.9 mi45.8
quarryBrooksville South Cement PlantBrooksville27.4 mi54.8
quarryBrooksville QuarryBrooksville27.5 mi55
quarryCenter Hill MineBrooksville30.6 mi61.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
WILSON MARISSA
1 active project · Pasco
~7,607 est. loads · fill dirt
Contractor
UB CONSULTING LLC
1 active project · Hillsborough
~4 est. loads · fill dirt
📞 (786) 452-2837

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260618452026-05-21Open ↗
fl_dor_cadastralFDOR_22-26-20-0040-B1A00-0000_066309a42026-06-27Open ↗
pascopaPASCOPA_22-26-20-0040-B1A00-0000_066309a42026-06-29Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
22-26-20-0040-B1A00-0000
Strap
22-26-20-0040-B1A00-0000
Address
Acreage
54.77 ac
Sq ft
2,385,781
Owner of record
MEADOW POINTE IV COMMUNITY
DEVELOPMENT DISTRICT
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/wilson-marissa-project-22-26-20-pasco-fl-4c8d0d01