WESTFALL CONSTRUCTION project — 10-26-21
10-26-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Westfall Construction's site development project in the permit-issued stage presents a near-term earthwork hauling opportunity with a strong 75/100 score. The project requires site preparation and material movement, making it ideal for hauling providers to engage now before active excavation begins. Contact prime GC Westfall Construction Inc. at (813) 291-0693 or owner Joann Dawn Quam to secure material haul-off and fill delivery contracts.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026039603 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 6.4 mi | 12.9 |
| quarry | West Florida Aggregate | Webster | 19.0 mi | 38 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.6 mi | 41.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 25.6 mi | 51.2 |
| sand pit | County Line Mine | Spring Hill | 26.4 mi | 52.9 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 27.7 mi | 55.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.9 mi | 55.9 |
| quarry | Brooksville Quarry | Brooksville | 28.2 mi | 56.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026039603 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/westfall-construction-project-10-26-21-pasco-fl-89c78b1e