NOC – Pamer Barry D | Westfall Construction Inc dba Westfall Roofing | 605 BARKFIELD LOOP BRANDON
605 BARKFIELD LOOP BRANDON, FL 33511-7121
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Westfall Construction is undertaking a roof replacement and site development project at 605 Barkfield Loop in Brandon, FL, with earthwork components and a permit recently issued. This project presents solid hauling demand for debris removal, waste handling, and potential material staging given the roof replacement scope and site prep work involved. Contact Westfall Construction's prime GC at (813) 291-0693 or reach out to owner Pamer Barry to secure demolition debris and roofing waste haul contracts.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025446018 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 9.5 mi | 19 |
| quarry | Caloosa Materials | Ruskin | 16.7 mi | 33.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 20.7 mi | 41.3 |
| quarry | Four Corners | Lithia | 21.8 mi | 43.6 |
| quarry | South Pasture Mine | Lithia | 27.5 mi | 55.1 |
| quarry | Wingate Creek Mine | Lithia | 29.8 mi | 59.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 35.4 mi | 70.8 |
| quarry | South Fort Meade Mine | Lithia | 37.2 mi | 74.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025446018 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 073648-4098
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/westfall-construction-inc-project-l-6-b-3-southwood-hills-unit-6-hillsborough-fl-a82f98c6