WESTERN SURETY CO project — 408 NOBLE FAIRE DRIVE
408 NOBLE FAIRE DRIVE
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022141968 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 5.8 mi | 11.7 |
| quarry | Tampa Cement Grinding Plant | Tampa | 17.5 mi | 35.1 |
| quarry | Wingate Creek Mine | Lithia | 19.3 mi | 38.5 |
| quarry | Four Corners | Lithia | 23.3 mi | 46.7 |
| quarry | South Pasture Mine | Lithia | 24.6 mi | 49.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 35.2 mi | 70.3 |
| quarry | South Fort Meade Mine | Lithia | 36.2 mi | 72.5 |
| quarry | 4M-31 Mine | Alva | 44.9 mi | 89.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2022141968 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/western-surety-co-project-408-noble-faire-drive-hillsborough-fl-17e9d93e