WATER'S EDGE OF BRADENTON ASSISTED LIVING
2015 32ND AVE, BRADENTON, FL, 34205
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21NPDES_STORMWATERCaptured FLR10OZ39 from npdes_stormwater
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 18.2 mi | 36.4 |
| quarry | Wingate Creek Mine | Lithia | 28.2 mi | 56.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 33.2 mi | 66.4 |
| quarry | Florida Shell & Fill Company LLC | Naples | 39.2 mi | 78.3 |
| quarry | South Pasture Mine | Lithia | 40.7 mi | 81.4 |
| quarry | Four Corners | Lithia | 42.5 mi | 85.1 |
| quarry | 4M-31 Mine | Alva | 47.8 mi | 95.7 |
| landfill | 63RD AVENUE EAST WASTE PROCESSING FACILITY | Bradenton | 3.7 mi | 7.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| npdes_stormwater | FLR10OZ39 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- City
- BRADENTON
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/water-s-edge-of-bradenton-assisted-living-fl-48fd65d4