Leads/uplifting-air-project-20-25-19-pasco-fl-636c7ada
Approved · unknownPasco County

UPLIFTING AIR project — 20-25-19

20-25-19

Load estimate pending
Lifecycle
Permitted as of Apr 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

UPLIFTING AIR project — 20-25-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/9/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
UPLIFTING AIR LLC
Why this is a hauling opportunity: NOC — unclassified description: 20-25-19 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026065631 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
7.4 mi
Round trip
14.7 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 7.4 mi14.7
quarryCentral State Aggregates LLCZephyrhill10.2 mi20.4
sand pitCounty Line MineSpring Hill12.8 mi25.7
quarryBrooksville QuarryBrooksville19.9 mi39.9
quarryBrooksville South Cement PlantBrooksville20.2 mi40.4
quarryWest Florida AggregateWebster23.1 mi46.2
quarryCalcium PlantJacksonville23.5 mi47.1
quarryTampa Cement Grinding PlantTampa24.8 mi49.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
UPLIFTING AIR LLC
1 active project · Pasco
12231 Main Street Unit 1196 San Antonio, FL 33576

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260656312026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/uplifting-air-project-20-25-19-pasco-fl-636c7ada