U S BUILDING CONSTRUCTION project — 20-26-17
20-26-17
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
U S BUILDING CONSTRUCTION is undertaking site development earthwork at 20-26-17 with permits now issued, representing a high-priority hauling opportunity (75/100 score). This project requires immediate outreach for soil export, fill materials, and site preparation logistics. Key contact is U S BUILDING CONSTRUCTION (GC) with QUALIFIED PROPERTY MGT as the owner-developer—both should be engaged now while permits are fresh and planning phases are underway.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025172911 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025172911 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/u-s-building-construction-project-20-26-17-pasco-fl-f17b371f