TUBULAR BUILDING SYSTEMS LLC project — 13-25-21
13-25-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
TUBULAR BUILDING SYSTEMS LLC is undertaking a site development earthwork project at 13-25-21 with permits recently issued, presenting an immediate hauling opportunity with a strong 75/100 score. The project requires significant earthwork management, making it ideal for hauling providers specializing in material movement and site prep services. Key contacts are owner USCHOLD ROBERT and prime GC TUBULAR BUILDING SYSTEMS LLC—now is the optimal time to engage before active construction mobilization.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025238719 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 10.9 mi | 21.7 |
| quarry | West Florida Aggregate | Webster | 13.7 mi | 27.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.6 mi | 41.1 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 22.3 mi | 44.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 25.0 mi | 49.9 |
| sand pit | 474 Sand Mine | Brooksville | 25.1 mi | 50.3 |
| quarry | Brooksville Quarry | Brooksville | 25.4 mi | 50.9 |
| quarry | Center Hill Mine | Brooksville | 25.7 mi | 51.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025238719 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/tubular-building-systems-llc-project-13-25-21-pasco-fl-a99f6e6c