Leads/total-demolition-of-2-structures-incl-slabs-foundations-1-underground-t-1601-n-3-39858d34
Approved · unknownHillsborough County

Total Demolition of (2) Structures Incl. Slabs & Foundations & (1) Underground T — 1601 N 34th Street

1601 N 34th Street, Tampa, FL 33605

Load estimate pending
Lifecycle
Permitted as of Apr 13, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Total Demolition of (2) Structures Incl. Slabs & Foundations & (1) Underground T — 1601 N 34th Street

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 175936-0000
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
The BG Group, LLC
Developer / Applicant
Waste Management Inc.
Why this is a hauling opportunity: NOC — new construction/site work likely needs hauling; Total Demolition of (2) Structures Incl. Slabs & Foundations | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-02OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026141908 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.0 mi
Round trip
4.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa2.0 mi4.1
quarryCaloosa MaterialsRuskin17.7 mi35.4
quarryCentral State Aggregates LLCZephyrhill18.6 mi37.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 29.8 mi59.6
quarryFour CornersLithia30.6 mi61.3
sand pitCounty Line MineSpring Hill34.0 mi67.9
quarrySouth Pasture MineLithia36.1 mi72.2
quarryWingate Creek MineLithia36.6 mi73.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Waste Management Inc.
Contractor
The BG Group, LLC

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20261419082026-07-02Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
175936-0000
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/total-demolition-of-2-structures-incl-slabs-foundations-1-underground-t-1601-n-3-39858d34