Leads/teco-transmission-project-washington-st-sub-hillsborough-fl-26473ffb
Approved · unknownHillsborough County

TECO TRANSMISSION PROJECT (WASHINGTON ST SUB)

708 WASHINGTON ST, TAMPA, FL, 33602

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

TECO TRANSMISSION PROJECT (WASHINGTON ST SUB)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
TECO TRANSMISSION PROJECT (WASHINGTON ST SUB)
The story

The TECO Transmission Project is a site development initiative focused on stormwater management located at 708 Washington St, Tampa, FL, currently under construction. This project presents significant hauling opportunities due to its active construction stage and a strong earthwork signal, indicating a need for materials, excavation, and waste management services. Key contacts for this project include the owner-developer, TECO Transmission Project, which can facilitate partnerships for hauling providers looking to engage in this critical infrastructure development.

Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLG073707 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.1 mi
Round trip
2.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa1.1 mi2.1
quarryCaloosa MaterialsRuskin16.9 mi33.8
quarryCentral State Aggregates LLCZephyrhill20.2 mi40.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.4 mi60.8
quarryFour CornersLithia32.1 mi64.2
sand pitCounty Line MineSpring Hill34.2 mi68.5
quarryWingate Creek MineLithia37.0 mi74
quarrySouth Pasture MineLithia37.3 mi74.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
TECO TRANSMISSION PROJECT (WASHINGTON ST SUB)

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
npdes_stormwaterFLG0737072026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
City
TAMPA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/teco-transmission-project-washington-st-sub-hillsborough-fl-26473ffb