Approved · unknownHillsborough County
Tear off and Replace 17 Squares of GAF TPO 60 mil.
1707 E Frierson Ave, T, 33610
~2loads
fill dirt
≤1 wk
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Tear off and Replace 17 Squares of GAF TPO 60 mil.
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.016 ac
Parcel 1570250100
Est truck loads
—
Needs site plan parse
Sources seen
3
Public records referencing this job
Why this is a hauling opportunity: Base unknown/other (20) | single-trade residential permit — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-21TAMPA_ACCELACaptured BTR-26-0627807 from tampa_accela
- 2026-06-21HCPACaptured HCPA_1570250100_4a2d7249 from hcpa
- 2026-06-26HCPACaptured HCPA_1570250100_28a5fd22 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
4.0 mi
Round trip
8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 4.0 mi | 8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.0 mi | 34 |
| quarry | Caloosa Materials | Ruskin | 20.1 mi | 40.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 27.3 mi | 54.5 |
| sand pit | County Line Mine | Spring Hill | 31.3 mi | 62.6 |
| quarry | Four Corners | Lithia | 32.8 mi | 65.6 |
| quarry | South Pasture Mine | Lithia | 38.5 mi | 77.1 |
| quarry | Wingate Creek Mine | Lithia | 39.3 mi | 78.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Contractor
ARLEY HOME SOLUTIONS LLC
4 active projects · Hillsborough
~12 est. loads · fill dirt
📞 (813) 580-2413Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| tampa_accela | BTR-26-0627807 | 2026-06-21 | Open ↗ |
| hcpa | HCPA_1570250100_4a2d7249 | 2026-06-21 | Open ↗ |
| hcpa | HCPA_1570250100_28a5fd22 | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1570250100
- Strap
- A-06-29-19-ZZZ-000005-76150.0
- Address
- 1707 E FRIERSON AVE, TAMPA
- Zip
- 33610
- Acreage
- 0.016 ac
- Sq ft
- 703
- Homestead
- NO
Owner of record
882 LAMBERTON LLC
Last sale
2026-03-31
$205,000
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/tear-off-and-replace-17-squares-of-gaf-tpo-60-mil-hillsborough-fl-fa4300f5