Leads/tampa-bay-construction-co-inc-project-pt-s-10-t-29-r-20-hillsborough-fl-6d64ba94
Approved · unknownHillsborough County

NOC – Lloyd Stewart | Tampa Bay Constuction Co, Inc. | 1908 S Oak St

1908 S Oak St, Seffner, FL 33584

~54loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Dec 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Lloyd Stewart | Tampa Bay Constuction Co, Inc. | 1908 S Oak St

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.216 ac
Parcel 0660040000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
TAMPA BAY CONSTRUCTION CO INC
Developer / Applicant
STEWART LLOYD
The story

Lloyd Stewart's residential site development at 1908 S Oak St in Seffner is entering the earthwork phase with permits issued, signaling immediate ground preparation and foundation work ahead. Tampa Bay Construction Co Inc (prime GC) will likely need significant soil excavation, grading, and material haul-off services typical of single-family residential development. Contact Lloyd Stewart (owner/developer) or Tampa Bay Construction Co Inc directly to position for foundation excavation, fill material delivery, and site clearing debris removal.

Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Construction of Primary Residence | size signal: (+6) | stage=permit_issued, recent (+10) | size signal: (+6) | stage=permit_issued, recent (+10) | size signal: ~54 est. loads (+6) | stage=permit_issued, recent (+10) | size signal: ~54 est. loads (+6) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025532639 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_0660040000_2ed50891 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
9.6 mi
Round trip
19.3 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa9.6 mi19.3
quarryCentral State Aggregates LLCZephyrhill15.6 mi31.2
quarryCaloosa MaterialsRuskin21.0 mi42.1
quarryFour CornersLithia24.6 mi49.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.6 mi61.3
quarrySouth Pasture MineLithia31.1 mi62.3
quarryWingate Creek MineLithia34.7 mi69.3
sand pitCounty Line MineSpring Hill35.6 mi71.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
STEWART LLOYD
Contractor
TAMPA BAY CONSTRUCTION CO INC
1 active project · Hillsborough
~54 est. loads · fill dirt
11717 Winn Rd, Riverview, FL 33569

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20255326392026-05-21Open ↗
hcpaHCPA_0660040000_2ed508912026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0660040000
Strap
U-10-29-20-ZZZ-000002-42360.0
Address
1908 S OAK ST, SEFFNER
Zip
33584
Acreage
0.216 ac
Sq ft
9,426
Homestead
NO
Owner of record
STEWART LLOYD
STEWART BRIAN ANTONIO
Last sale
2025-12-17
$100(transfer)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/tampa-bay-construction-co-inc-project-pt-s-10-t-29-r-20-hillsborough-fl-6d64ba94