Leads/tallahassee-city-of-ms4-leon-fl-31bee368
Approved · unknownLeon County

TALLAHASSEE, CITY OF - MS4

300 S ADAMS ST, TALLAHASSEE, FL, 32301-1737

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TALLAHASSEE, CITY OF - MS4

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
TALLAHASSEE, CITY OF - MS4
Why this is a hauling opportunity: Base site_development/stormwater (40) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLS000034 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
LEON COUNTY SOLID WASTE TRANSFER STATION · Tallahassee
One-way
4.7 mi
Round trip
9.3 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
8.2 mi
Round trip
16.4 mi
TypeNameCityOne-wayRT mi
sand pitSilver Lake 1Tallahassee8.2 mi16.4
quarryActive Minerals Attapulgite DivisionQuincy20.5 mi41
quarryQuincy Plant and MinesQUINCY20.5 mi41.1
sand pitA-Mining Group II LLC.Quincy22.1 mi44.1
quarryCYD Cabbage GroveDaytona Beach27.5 mi55.1
quarryPerry QuarryFort Myers27.8 mi55.6
quarrySRM Materials Cabbage GroveLamont47.2 mi94.4
transfer stationLEON COUNTY SOLID WASTE TRANSFER STATIONTallahassee4.7 mi9.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
TALLAHASSEE, CITY OF - MS4

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Leon County Permits
Tallahassee area Building Services
ConnectorRecord IDCapturedLink
npdes_stormwaterFLS0000342026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Leon
City
TALLAHASSEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/tallahassee-city-of-ms4-leon-fl-31bee368