Leads/suncoast-power-solutions-project-9709-hidden-cove-ct-tampa-fl-hillsborough-fl-87986288
Approved · unknownHillsborough County

NOC – Salvatore Musumeci | Suncoast Power Solutions | 3709 Hidden Cove Ct

3709 Hidden Cove Ct, Tampa, FL 33618

Load estimate pending
Lifecycle
Permitted as of Jul 21, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Salvatore Musumeci | Suncoast Power Solutions | 3709 Hidden Cove Ct

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$100
Actual — from source record
Acreage
Parcel 024372-1504
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
SUNCOAST POWER SOLUTIONS CORP
📞 (813) 829-0037
Developer / Applicant
MUSUMECI SALVATORE
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Generator Installation | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025315567 from official_records_noc
  2. 2026-06-13FL_DOR_CADASTRAL
    Captured FDOR_182822150000000A00000U_20a787db from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
7.7 mi
Round trip
15.3 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa7.7 mi15.3
quarryCentral State Aggregates LLCZephyrhill16.4 mi32.8
quarryCaloosa MaterialsRuskin23.4 mi46.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 24.0 mi48
sand pitCounty Line MineSpring Hill27.6 mi55.3
quarryFour CornersLithia36.9 mi73.8
quarryBrooksville QuarryBrooksville37.7 mi75.4
quarryBrooksville South Cement PlantBrooksville38.0 mi76.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MUSUMECI SALVATORE
Contractor
SUNCOAST POWER SOLUTIONS CORP
10 active projects · Hillsborough
~30 est. loads · fill dirt
📞 (813) 829-0037

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20253155672026-05-21Open ↗
fl_dor_cadastralFDOR_182822150000000A00000U_20a787db2026-06-13Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
024372-1504
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/suncoast-power-solutions-project-9709-hidden-cove-ct-tampa-fl-hillsborough-fl-87986288