Leads/suncoast-power-solutions-corp-project-hillsborough-county-hillsborough-fl-b79f1db1
Approved · unknownHillsborough County

NOC – Stephanie Rich / Ballard T A Trustee | Suncoast Power Solutions | 1902 S Ardsley St

1902 S Ardsley St, Tampa, FL 33629-5931

~12loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Dec 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Stephanie Rich / Ballard T A Trustee | Suncoast Power Solutions | 1902 S Ardsley St

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.083 ac
Parcel 1183110000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
SUNCOAST POWER SOLUTIONS CORP
📞 (813) 829-0037
Developer / Applicant
RICH STEPHANIE
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Generator Installation | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025532471 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_1183110000_50dc0f84 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.5 mi
Round trip
6.9 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa3.5 mi6.9
quarryCaloosa MaterialsRuskin15.9 mi31.8
quarryCentral State Aggregates LLCZephyrhill22.8 mi45.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.7 mi63.4
quarryFour CornersLithia34.1 mi68.3
sand pitCounty Line MineSpring Hill35.2 mi70.3
quarryWingate Creek MineLithia37.4 mi74.8
quarrySouth Pasture MineLithia38.9 mi77.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
RICH STEPHANIE
Contractor
SUNCOAST POWER SOLUTIONS CORP
10 active projects · Hillsborough
~30 est. loads · fill dirt
📞 (813) 829-0037

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20255324712026-05-21Open ↗
hcpaHCPA_1183110000_50dc0f842026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1183110000
Strap
A-27-29-18-3Q4-000015-00003.0
Address
1902 S ARDSLEY ST, TAMPA
Zip
33629
Acreage
0.083 ac
Sq ft
3,614
Homestead
NO
Owner of record
BALLARD T A TRUSTEE
Last sale
2018-07-17
$4,400,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/suncoast-power-solutions-corp-project-hillsborough-county-hillsborough-fl-b79f1db1