Approved · unknownHillsborough County
NOC – Joyce C. Cranford | Sunbelt Home Solutions | 4503 US Hwy 92 W
4503 US Hwy 92 W, Plant City, FL 33563
Load estimate pending
Lifecycle
Permitted as of Jul 15, 2025
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
NOC – Joyce C. Cranford | Sunbelt Home Solutions | 4503 US Hwy 92 W
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
Developer / Applicant
CRAWFORD JOYCE
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Window/Door Replacement + Size for Size | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025306236 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
14.8 mi
Round trip
29.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 14.8 mi | 29.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 17.5 mi | 35 |
| quarry | Four Corners | Lithia | 21.5 mi | 43.1 |
| quarry | Caloosa Materials | Ruskin | 27.3 mi | 54.6 |
| quarry | South Pasture Mine | Lithia | 29.2 mi | 58.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.8 mi | 63.7 |
| quarry | West Florida Aggregate | Webster | 33.7 mi | 67.4 |
| sand pit | Gator Sand Mine | Brooksville | 34.2 mi | 68.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
CRAWFORD JOYCE
Contractor
SUNBELT HOME SOLUTIONS, INC.
4 active projects · Hillsborough
~4 est. loads · fill dirt
📞 (727) 202-7562Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025306236 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/sunbelt-home-solutions-project-4503-us-hwy-92-w-plant-city-33563-hillsborough-fl-31a8761f