Leads/sparkman-wharf-hillsborough-fl-bb332bf7
Active · utilitiesHillsborough County

SPARKMAN WHARF

615 CHANNELSIDE DR, TAMPA, FL, 33602

~91loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

SPARKMAN WHARF

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$49.3M
Actual — from source record
Acreage
0.545 ac
Parcel 1987551310
Est truck loads
Needs site plan parse
Sources seen
9
Public records referencing this job
General Contractor
PYE BARKER FIRE & SAFETY DBA
Developer / Applicant
TAMPA PORT AUTHORITY
Why this is a hauling opportunity: Base site_development/stormwater (40) | size signal: ~91 est. loads (+6) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-11NPDES_STORMWATER
    Captured FLG072514 from npdes_stormwater
  2. 2026-05-16HCPA
    Captured HCPA_1987551310 from hcpa
  3. 2026-05-16HCPA
    Captured HCPA_1987551310_2afc2ba8 from hcpa
  4. 2026-05-22HCPA
    Captured HCPA_1987551310_b90844f7 from hcpa
  5. 2026-05-25HCPA
    Captured HCPA_1987551310_827e0001 from hcpa
  6. 2026-06-21TAMPA_ACCELA
    Captured BLD-26-0526002 from tampa_accela
  7. 2026-06-21HCPA
    Captured HCPA_1987551310_3aeac2b3 from hcpa
  8. 2026-06-24HCPA
    Captured HCPA_1987551310_18598a4c from hcpa
  9. 2026-06-24FL_DOR_CADASTRAL
    Captured FDOR_192919ZZZ000005940400A_18598a4c from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
0.6 mi
Round trip
1.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa0.6 mi1.2
quarryCaloosa MaterialsRuskin16.6 mi33.2
quarryCentral State Aggregates LLCZephyrhill20.2 mi40.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.7 mi61.4
quarryFour CornersLithia31.6 mi63.2
sand pitCounty Line MineSpring Hill34.6 mi69.2
quarryWingate Creek MineLithia36.5 mi73
quarrySouth Pasture MineLithia36.8 mi73.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
PYE BARKER FIRE & SAFETY DBA
1 active project · Hillsborough
~61 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
npdes_stormwaterFLG0725142026-03-11Open ↗
hcpaHCPA_19875513102026-05-16Open ↗
hcpaHCPA_1987551310_2afc2ba82026-05-16Open ↗
hcpaHCPA_1987551310_b90844f72026-05-22Open ↗
hcpaHCPA_1987551310_827e00012026-05-25Open ↗
tampa_accelaBLD-26-05260022026-06-21Open ↗
hcpaHCPA_1987551310_3aeac2b32026-06-21Open ↗
hcpaHCPA_1987551310_18598a4c2026-06-24Open ↗
fl_dor_cadastralFDOR_192919ZZZ000005940400A_18598a4c2026-06-24Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1987551310
Strap
A-19-29-19-ZZZ-000005-94040.0
Address
615 S CHANNELSIDE DR, TAMPA
Zip
33602
Acreage
0.545 ac
Sq ft
23,723
Homestead
NO
Owner of record
TAMPA PORT AUTHORITY
Last sale

No sale on record

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/sparkman-wharf-hillsborough-fl-bb332bf7