NOC – Margaret L Riley | Ty Simmons - Southern Legacy Construction LLC | 2214 W. Del Webb Blvd.
2214 W. Del Webb Blvd., Sun City Center, FL 33573
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
This is a residential site development project at 2214 W. Del Webb Blvd. in Sun City Center, FL involving earthwork and foundation work for a screened room addition on an existing slab—a moderate-scale undertaking with confirmed NOC filing status. Southern Legacy Construction (678-933-2002) is the prime GC managing the work with owner Margaret L. Riley, indicating an active, legitimate project with defined hauling needs for site prep, excavation, and material movement. The 75/100 hauling score reflects strong project signals and opportunities for earthmoving equipment, debris removal, and aggregate/fill material delivery typical of residential development work.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-07OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026175301 from official_records_noc
- 2026-05-19HCPACaptured HCPA_0542461168_270b636a from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 6.0 mi | 12.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 14.6 mi | 29.3 |
| quarry | Wingate Creek Mine | Lithia | 21.7 mi | 43.4 |
| quarry | Four Corners | Lithia | 23.3 mi | 46.5 |
| quarry | South Pasture Mine | Lithia | 25.5 mi | 51 |
| quarry | Central State Aggregates LLC | Zephyrhill | 32.2 mi | 64.4 |
| quarry | South Fort Meade Mine | Lithia | 37.0 mi | 73.9 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 45.4 mi | 90.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026175301 | 2026-05-07 | Open ↗ |
| hcpa | HCPA_0542461168_270b636a | 2026-05-19 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0542461168
- Strap
- U-36-31-19-1U1-000002-00023.0
- Address
- 2214 W DEL WEBB BLVD, SUN CITY CENTER
- Zip
- 33573
- Acreage
- 0.022 ac
- Sq ft
- 945
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/souther-legacy-construction-project-hillsborough-county-hillsborough-fl-4edc87f1