Leads/smith-ryan-west-project-07-24-18-pasco-fl-902429e5
Approved · unknownPasco County

SMITH RYAN WEST project — 07-24-18

07-24-18

~153loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Mar 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

SMITH RYAN WEST project — 07-24-18

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/9/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$13K
Actual — from source record
Acreage
1.1 ac
Parcel 07-24-18-004A-00002-4500
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
UNITED WHOLESALE MORTGAGE
Why this is a hauling opportunity: NOC — unclassified description: 07-24-18 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 1.1 ac disturbed, ~153 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.1 ac disturbed, ~153 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.1 ac disturbed, ~153 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.1 ac disturbed, ~153 est. loads (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026042786 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_07-24-18-004A-00002-4500_8ac57b58 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_07-24-18-004A-00002-4500_8ac57b58 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
2.2 mi
Round trip
4.4 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill2.2 mi4.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 3.7 mi7.4
quarryBrooksville QuarryBrooksville13.4 mi26.8
quarryBrooksville South Cement PlantBrooksville14.1 mi28.2
quarryCalcium PlantJacksonville17.1 mi34.1
quarryCenter Hill MineBrooksville20.5 mi41
quarryCentral State Aggregates LLCZephyrhill20.8 mi41.5
quarryWest Florida AggregateWebster25.8 mi51.6
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
UNITED WHOLESALE MORTGAGE

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260427862026-05-21Open ↗
fl_dor_cadastralFDOR_07-24-18-004A-00002-4500_8ac57b582026-05-28Open ↗
pascopaPASCOPA_07-24-18-004A-00002-4500_8ac57b582026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
07-24-18-004A-00002-4500
Strap
07-24-18-004A-00002-4500
Address
Acreage
1.1 ac
Sq ft
47,916
Owner of record
ARROYO MARIANO JR
Last sale

No sale on record

Appraiser valuation
Just (market)
$13,428

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/smith-ryan-west-project-07-24-18-pasco-fl-902429e5