Leads/smith-cynthia-project-17-25-17-pasco-fl-92e43610
Approved · unknownPasco County

QUALITY CRAFTSMEN LLC project — 17-25-17

17-25-17

~278loads
fill dirt + base rock
2 wk
Lifecycle
Permitted as of Feb 10, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUALITY CRAFTSMEN LLC project — 17-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
2 ac
Parcel 17-25-17-0210-0CC00-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
QUALITY CRAFTSMEN, LLC
📞 (407) 307-3137
Developer / Applicant
RESERVE AT GOLDEN ACRES
Why this is a hauling opportunity: NOC — unclassified description: 17-25-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 2.0 ac disturbed, ~278 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 2.0 ac disturbed, ~278 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 2.0 ac disturbed, ~278 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 2.0 ac disturbed, ~278 est. loads (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026024920 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_17-25-17-0210-0CC00-0000_3ea65be8 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_17-25-17-0210-0CC00-0000_3ea65be8 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
9.2 mi
Round trip
18.4 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill9.2 mi18.4
quarryGeorgia Stone Spring Hill QuarryAtlanta 9.8 mi19.7
quarryCentral State Aggregates LLCZephyrhill21.3 mi42.7
quarryBrooksville QuarryBrooksville22.0 mi43.9
quarryBrooksville South Cement PlantBrooksville22.7 mi45.4
quarryCalcium PlantJacksonville25.6 mi51.2
quarryTampa Cement Grinding PlantTampa28.1 mi56.1
quarryCenter Hill MineBrooksville29.1 mi58.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
RESERVE AT GOLDEN ACRES
Contractor
QUALITY CRAFTSMEN, LLC
1 active project · Hillsborough
📞 (407) 307-3137

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260249202026-05-21Open ↗
fl_dor_cadastralFDOR_17-25-17-0210-0CC00-0000_3ea65be82026-05-28Open ↗
pascopaPASCOPA_17-25-17-0210-0CC00-0000_3ea65be82026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
17-25-17-0210-0CC00-0000
Strap
17-25-17-0210-0CC00-0000
Address
Acreage
2 ac
Sq ft
87,120
Owner of record
RESERVE AT GOLDEN ACRES
HOMEOWNERS ASSOCIATION INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/smith-cynthia-project-17-25-17-pasco-fl-92e43610