NOC – William B Tiller & Donald H Tiller Jr | Clark H. Scherer - Scherer Construction LLC | 3902 E. Columbus Dr.
3902 E. Columbus Dr., Tampa FL 33605
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Scherer Construction is mobilizing a 20,395 SF pre-engineered metal building (freezer/cooler facility) at 3902 E. Columbus Dr. in Tampa with full MEP and site infrastructure—a permit-issued project signaling imminent ground work. The earthwork phase and associated site development create strong hauling demand for excavation spoil removal, fill material delivery, and construction debris management. Key contacts are Scherer Construction LLC (prime GC) and Columbus North RE LLC (owner/developer at 614-822-7550).
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026129251 from official_records_noc
- 2026-05-22HCPACaptured HCPA_1752720000_45007cdf from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 2.7 mi | 5.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.9 mi | 35.9 |
| quarry | Caloosa Materials | Ruskin | 18.3 mi | 36.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 29.3 mi | 58.6 |
| quarry | Four Corners | Lithia | 30.6 mi | 61.2 |
| sand pit | County Line Mine | Spring Hill | 33.5 mi | 67 |
| quarry | South Pasture Mine | Lithia | 36.2 mi | 72.4 |
| quarry | Wingate Creek Mine | Lithia | 36.9 mi | 73.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026129251 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_1752720000_45007cdf | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 1752720000
- Strap
- A-09-29-19-4O3-000000-00005.0
- Address
- 3902 E COLUMBUS DR, TAMPA
- Zip
- 33605
- Acreage
- 0.067 ac
- Sq ft
- 2,911
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/scherer-construction-llc-project-l-5-gardnville-hillsborough-fl-8ef73f85