Leads/rl-building-contractors-project-810-chadsworth-ave-seffner-fl-hillsborough-fl-907b6ab5
Approved · unknownHillsborough County

RL BUILDING CONTRACTORS project — 810 CHADSWORTH AVE SEFFNER FL

810 CHADSWORTH AVE SEFFNER FL

Load estimate pending
Lifecycle
Permitted as of Dec 10, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

RL BUILDING CONTRACTORS project — 810 CHADSWORTH AVE SEFFNER FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
RL BUILDING CONTRACTORS
Developer / Applicant
OP SPE TPA 1 LLC
Why this is a hauling opportunity: General contractor NOC: RL BUILDING CONTRACTORS

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-04OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2021639315 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
10.4 mi
Round trip
20.8 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa10.4 mi20.8
quarryCentral State Aggregates LLCZephyrhill14.7 mi29.4
quarryCaloosa MaterialsRuskin22.1 mi44.1
quarryFour CornersLithia24.8 mi49.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 30.0 mi60
quarrySouth Pasture MineLithia31.5 mi63
sand pitCounty Line MineSpring Hill35.1 mi70.2
quarryWingate Creek MineLithia35.4 mi70.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
OP SPE TPA 1 LLC
Contractor
RL BUILDING CONTRACTORS
1 active project · Hillsborough
~4 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20216393152026-07-04Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/rl-building-contractors-project-810-chadsworth-ave-seffner-fl-hillsborough-fl-907b6ab5